My Home Builder handles house demolition in Vancouver as part of building the new home, from the hazardous materials survey and permits to excavation. In short: the teardown is tied to your new building permit, needs a hazmat survey and abatement first, and older houses must meet the city’s recycling rules.
If you plan to demolish a house in Vancouver to build a new home, duplex or multiplex in Vancouver, the teardown is not something you can rush ahead of everything else. In the City of Vancouver the demolition is normally tied to the permit for what replaces it, the old house must be checked for asbestos and other hazardous materials first, older houses must meet recycling targets under the city’s green demolition rules, and gas, hydro, water and sewer services all have to be properly disconnected. Get the order right and the lot is ready for excavation; get it wrong and you wait weeks on paperwork that should have started months earlier.
At a glance
- Service: demolition of an existing house as part of a new home, duplex or multiplex build
- Areas served: City of Vancouver and the rest of Metro Vancouver
- What is included: hazardous materials survey coordination, abatement, demolition and recycling records, utility disconnections, site preparation
- Typical steps: heritage and tree checks, permit application, hazmat survey and abatement, disconnections, demolition, excavation
- How to start: call 778-907-4161 or request a free building quote
When can an old house be demolished in Vancouver?
Usually only once the building permit for the new home is ready, because the city links the demolition to what replaces it. A common assumption is that you can knock the house down first and sort out the new design later. In Vancouver that rarely works for a one- or two-family lot. The city generally wants to see what is going to be built before it lets an existing house come down, so the demolition permit is usually processed alongside, and issued with or after, the building permit for the new home. In other words, the clock on your teardown starts when your new-home drawings are submitted.
That is also why we treat demolition planning as part of design. Decisions about the new foundation, the excavation depth, which trees stay and where the new service connections come in all affect how the old house is taken down. Our step-by-step guide to building a custom home in Vancouver shows where this fits in the larger sequence. Rules and processing practices change, so always confirm current requirements with the City of Vancouver before you set a moving date.
If you are still weighing whether to tear down at all, this short video walks through the renovate-or-rebuild decision.

Does an old Vancouver house need a hazardous materials survey before demolition?
Yes. A survey by a qualified person comes first, and anything it finds must be removed before the house comes down. Most of the houses being replaced in Kitsilano, Dunbar, Kerrisdale, Renfrew-Collingwood or Sunset were built long before asbestos was phased out of building products. It turns up in drywall joint compound, vinyl floor tiles and their adhesive, stucco, vermiculite attic insulation, duct tape on old furnace ducts, and cement-based siding. Lead paint and mercury in old thermostats are also common.
WorkSafeBC requires a hazardous materials survey by a qualified person before demolition work that could disturb these materials. Anything identified has to be removed by an asbestos abatement contractor licensed in BC, and the house generally needs a clearance confirming the abatement is complete before demolition can proceed. A 1940s bungalow with plaster walls and several layers of flooring can hold more than you expect, so allow time for it.
What are Vancouver’s green demolition and recycling rules?
The City of Vancouver has a green demolition bylaw for one- and two-family houses. For older houses it requires that a set share of the demolition material be reused or recycled rather than sent to landfill, with stricter targets and deconstruction expectations for the oldest houses and those on the heritage register. The city typically asks for a refundable deposit and a recycling plan up front, then proof of where the material went (weigh tickets and receipts from recycling facilities) before the deposit is returned.
In practice this changes how the house comes down. The crew separates wood, metal, concrete, drywall and roofing and salvages old-growth fir, doors and fixtures where it can. That takes longer and needs sorting space, which matters on a narrow 33-foot East Vancouver lot with only a lane for bins. The exact percentages, deposit amounts and which house ages they apply to are set by the city and can change, so check the city’s current demolition permit recycling and deconstruction requirements for your house’s age.
Can heritage status or trees stop a demolition in Vancouver?
They can delay it or, for some heritage houses, prevent it, so check both before design starts. Before you assume a teardown is allowed, find out whether the house is listed on the Vancouver Heritage Register or sits in a heritage conservation area such as First Shaughnessy. In those cases demolition can require heritage review and may not be approved at all, which changes the whole project. Retaining and adding onto a character house, or converting it into several units, can sometimes be a better route; our sister team explains the trade-offs of renovating an old house versus building new.
Trees are the other early surprise. Vancouver’s Protection of Trees Bylaw requires a permit to remove trees above a set size on private property, and city street trees in front of the lot are protected too. An arborist report is usually part of the permit package, and protected trees need fencing that stays up through demolition and construction. A large cedar near the back corner can decide where the new house sits, so get the arborist out before the design is fixed.
Not sure whether your house is listed or which trees are protected? Call us at 778-907-4161 and we can talk through what to check before you commit to a design.
What needs to happen before demolition, step by step?
Work through these steps in order, starting while the new home is still being designed.
Pre-demolition checklist for a Vancouver lot
- Confirm heritage status and current zoning, including what the R1-1 multiplex rules allow on your lot, before design starts.
- Order a site survey and an arborist assessment so the new design works around protected trees.
- Book the hazardous materials survey early, ideally while design is still under way.
- Submit the building permit application with the demolition application and the recycling plan and deposit the city requires.
- Arrange abatement by a licensed contractor and keep the clearance letter on file.
- Request disconnection of gas (FortisBC), electricity (BC Hydro) and telecom, and arrange the city’s water and sewer disconnection.
- Check for an old buried oil tank and have it removed or decommissioned properly if one is found.
- Install tree protection and site fencing, notify neighbours, and get any street use permit needed for bins or equipment.
- Demolish with material separation, collect weigh tickets, and submit the recycling records to recover the deposit.

What demolition mistakes cost Vancouver owners time and money?
Most delays come from starting the paperwork late or leaving costs out of the quote.
Common mistakes we see
- Giving notice to tenants or booking movers too early. Until the building permit is close to issue, you do not really know when demolition can start.
- Treating the hazmat survey as a formality. Skipping areas or using an unqualified surveyor can lead to a stop-work order mid-demolition.
- Forgetting the oil tank. Many older Vancouver houses were heated with oil. A tank found by the excavator brings soil testing and possible remediation.
- Losing the recycling paperwork. Without weigh tickets, getting the deposit back becomes difficult.
- Pricing demolition as a lump sum without abatement. When you compare quotes, check that asbestos removal, oil tank work and service disconnections are either included or clearly listed as separate items. Our article on what it costs to build a house in Vancouver covers the other site costs to plan for.
Who is this guide for?
This is for Vancouver homeowners and buyers with an older house on a lot they want to replace, whether with a single family home, a duplex or a small multiplex. If you are still deciding what to build, start with our custom home building services in Vancouver; if you already have plans, the checklist above shows what to start now so the demolition does not hold up construction. Other municipalities such as Burnaby and North Vancouver have their own demolition processes, so the details will differ there.
Frequently asked questions
For most one- and two-family lots, not usually. The city generally links the demolition permit to the permit for the replacement building. There are limited exceptions, for example where a house is unsafe, so ask the city about your situation.
Yes. Asbestos-containing materials are usually invisible to the eye and can only be confirmed by sampling. WorkSafeBC requires the survey before demolition work that could disturb them, regardless of how the house looks.
The physical teardown of a house is usually short compared with the preparation. The overall time depends on what the survey finds, the abatement contractor’s availability, the recycling requirements for your house’s age, how quickly utilities are disconnected, and whether an oil tank turns up.
They are disconnected and capped through the city before demolition, and a new home usually gets new service connections sized for the new building. Your builder coordinates the applications with City of Vancouver Engineering.
Can one team handle the demolition and the new build?
We handle the demolition as part of the full build, from the hazmat survey and permits through to excavation, so you deal with one team. Call or send us your lot details for a free quote. We reply within one business day.